Scope of work: 12MWe Biomass Power Plant construction in Bolvadin, Afyon/Turkey on turnkey basis;

  • Boiler fabrication and installation
  • Bag filter and chimney installation
  • Screen and conveyor installation
  • Fan installation
  • Piping works of the whole project (including turbine)
  • Scaffolding installation
30 MW Biomass Fired Power Plant Installation
Menu